BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------ ------ ------------ ------------- ---------- ---------- --------- 1 BL-1 911702.9390 1468967.9050 996.17 30+10.41 16.02 LT 2 BL-2 912238.8880 1469751.1540 976.88 39+59.43 18.83 LT 3 BL-3 913020.7440 1470961.4590 970.41 53+94.95 35.82 LT 4 BL-4 913057.0130 1471787.6820 942.09 62+16.05 24.12 LT 101 GPS-1 912829.6640 1472592.1470 896.76 70+50.97 17.36 RT 102 GPS-2 912654.1950 1473357.8540 894.12 78+36.53 16.95 RT 5 BL-5 912413.2310 1474413.7180 911.96 89+19.52 16.00 RT 6 BL-6 912206.6580 1475455.8670 959.49 99+81.50 14.99 LT 7 BL-7 912091.5320 1475958.8480 958.74 104+97.48 14.91 LT 8 BL-8 911922.8350 1476697.4970 912.57 112+55.15 15.16 LT 103 GPS-3 911715.7650 1477471.5140 891.48 120+55.85 14.12 RT 104 GPS-4 911443.1410 1478627.6070 902.92 132+43.63 22.11 RT 9 BL-9 911227.9560 1479432.9440 899.53 140+79.40 15.83 RT 10 BL-10 910933.1800 1480320.7020 909.63 150+14.74 17.60 RT 11 BL-11 910668.9860 1481132.8820 960.88 158+68.81 15.84 RT 12 BL-12 910457.1010 1481788.7180 1008.70 165+57.54 15.73 RT 13 BL-13 910264.4270 1482751.2090 1023.94 175+37.90 23.42 LT 105 GPS-5 910095.6010 1483271.5350 1054.43 180+82.99 22.63 RT 106 GPS-6 909782.3040 1484601.3090 1079.26 194+49.17 25.26 RT 14 BL-14 909638.8700 1485391.6240 1061.95 202+51.37 15.35 LT 15 BL-15 909339.1490 1486523.3790 978.18 214+21.69 16.84 RT 16 BL-16 909070.7110 1487817.8860 980.98 227+43.30 17.73 LT 107 GPS-7 908782.6900 1489072.4650 1022.62 240+30.38 16.13 RT 17 BL-17 908675.0280 1489958.0940 1000.60 249+21.95 16.14 LT 108 GPS-8 908499.8960 1490871.1910 1050.16 258+51.20 13.93 RT 18 BL-18 908353.9100 1491986.0030 1038.38 269+75.08 18.58 LT 19 BL-19 908196.6360 1492975.6100 1043.78 279+76.07 18.71 RT 20 BL-20 908354.2960 1494048.8560 1046.54 290+56.66 19.94 LT 21 BL-21 908021.8500 1494828.2180 1043.63 OUTSIDE PROJECT LIMITS 110 GPS-10 907956.0750 1495677.7700 1057.59 OUTSIDE PROJECT LIMITS BY1 POINT DESC. NORTH EAST ELEVATION Y1 STATION OFFSET ------ ------ ------------ ------------- ---------- ---------- ---------- 206 BL-6 909093.8170 1486992.0610 959.49 OUTSIDE PROJECT LIMITS 111 BY1-1 912012.1560 1475504.1120 960.46 11+90.63 14.94 RT BY2 POINT DESC. NORTH EAST ELEVATION Y2 STATION OFFSET ------ ------ ------------ ------------- ---------- ---------- ---------- 121 BY2-1 911843.0770 1478065.2660 900.28 14+47.32 12.74 RT 203 GPS-3 911504.7810 1477747.3310 891.48 OUTSIDE PROJECT LIMITS BY3 POINT DESC. NORTH EAST ELEVATION Y4 STATION OFFSET ------ ------ ------------ ------------- ---------- ---------- ---------- 212 BL-11 910668.9860 1481132.8820 960.88 14+21.07 315.90 RT 131 BY3-1 910531.0260 1481484.4640 990.58 10+54.23 20.38 LT 132 BY3-2 910391.1390 1481278.6640 1006.46 13+80.14 14.12 RT 133 BY3-3 910283.8390 1481161.2420 1006.84 15+36.97 12.65 RT 134 BY3-4 910046.8470 1481243.6580 1013.40 17+82.58 17.58 RT BY4 POINT DESC. NORTH EAST ELEVATION Y5 STATION OFFSET ------ ------ ------------ ------------- ---------- ---------- ---------- 141 BY4-1 909819.5180 1485743.9670 1047.15 15+87.18 13.50 LT 214 BL-14 909638.8700 1485391.6240 1061.95 20+35.23 93.00 LT BY5 POINT DESC. NORTH EAST ELEVATION Y6 STATION OFFSET ------ ------ ------------ ------------- ---------- ---------- ---------- 215 BL-14 909638.8700 1485391.6240 1061.95 OUTSIDE PROJECT LIMITS 151 BY5-1 909323.2230 1485044.1270 1074.11 14+03.14 14.57 RT BY6 POINT DESC. NORTH EAST ELEVATION Y7 STATION OFFSET ------ ------ ------------ ------------- ---------- ---------- ---------- 161 BY6-1 908777.9940 1491854.2520 1041.53 12+16.47 14.01 LT 218 BL-18 908353.9100 1491986.0030 1038.38 16+87.67 69.66 RT **************************************** BM200 ELEVATION = 977.98 N 912316 E 1469492 L STATION 37+88 228 LEFT R/R SPIKE IN THE BASE OF 24" OAK NORTH OF GRAVEYARD ON NORTH SIDE OF NC 67 **************************************** **************************************** BM201 ELEVATION = 946.36 N 913117 E 1471674 L STATION 60+97 62 LEFT R/R SPIKE IN THE BASE OF 30" OAK EAST OF BURNT HOUSE ON NORTH SIDE OF NC 67 **************************************** **************************************** BM202 ELEVATION = 920.26 N 912259 E 1474725 L STATION 92+58 97 RIGHT R/R SPIKE IN THE BASE OF 36" FORKED MAPLE APPROX. 180' EAST OF PRIVATE DRIVE ON SOUTH SIDE NC 67 **************************************** **************************************** BM203 ELEVATION = 884.36 N 911505 E 1477747 L STATION 123+72 158 RIGHT R/R SPIKE IN THE BASE OF 24" BIRCH ALONG CREEK BANK 50' WEST OF CULVERT UNDER PRIVATE DR. (TILLY'S WAY) ON SOUTH SIDE OF NC 67 **************************************** **************************************** BM204 ELEVATION = 925.32 N 911016 E 1481083 L STATION 157+13 298 LEFT R/R SPIKE SET IN BASE OF 18" FORKED MAPLE ON EAST SIDE OF WATER WHEEL RD. AND NORTH SIDE OF NC 67 **************************************** **************************************** BM205 ELEVATION = 1066.29 N 910186 E 1483469 L STATION 182+55 111 LEFT R/R SPIKE SET IN BASE OF 46" FORKED WILLOW OAK IN FIELD NORTH OF ENTRANCE TO FIELD ON NORTH SIDE OF NC 67 **************************************** **************************************** BM206 ELEVATION = 966.75 N 909094 E 1486992 L STATION 219+34 148 RIGHT R/R SPIKE SET IN BASE OF 15" OAK IN BAMBOO THICKET ON NORTH SIDE OF NC 67 **************************************** **************************************** BM207 ELEVATION = 1040.21 N 908159 E 1490389 L STATION 254+28 426 RIGHT R/R SPIKE SET IN BASE OF 15" OAK ON WEST SIDE OF RD. LEADING TO BOONE TRACE SUBDIVISION ON SOUTH SIDE OF NC 67 **************************************** **************************************** BM208 ELEVATION = 1053.95 N 907991 E 1493631 L STATION 285+86 289 RIGHT R/R SPIKE SET IN BASE OF 28" OAK ON EAST SIDE REESE AV. IN TOWN OF BOONEVILLE ON SOUTH SIDE OF NC 67 **************************************** **************************************** BM209 ELEVATION = 1050.05 N 907632 E 1495481 PAST PROJECT LIMITS R/R SPIKE SET IN PARKING LOT OF CAVES BARBER SHOP AT CEMETARY ST. IN TOWN OF BOONEVILLE ON SOUTH SIDE OF NC 67 ****************************************