BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ----- ----- ----------- ----------- --------- --------- -------- 1 BL-1 237067.2200 652405.6320 61.623 OUTSIDE PROJECT LIMITS 2 BL-2 237211.2090 652538.1810 65.59 -LNBL-11+95.704 14.889 LT -L- 11+95.704 6.789 LT 3 BL-3 237333.5110 652652.3790 71.210 13+62.895 5.877 LT 4 BL-4 237440.0500 652762.8070 76.172 15+15.823 6.899 LT 5 BL-5 237533.9210 652880.7120 78.272 16+65.992 6.698 LT (BL-5 NOT FOUND 6/05) 6 BL-6 237567.6200 652928.4630 78.823 17+24.215 6.739 LT (BL-6 NOT FOUND 6/05) 7 BL-7 237643.0180 653050.0780 79.485 18+66.800 6.573 LT 8 BL-8 237724.4170 653209.8470 89.659 20+45.744 6.431 LT 9 BL-9 237802.6980 653369.1660 100.622 22+23.255 7.011 LT 10 BL-10 237884.8800 653538.4950 101.426 24+11.474 6.713 LT (BL-10 HAS BEEN DESTROYED) 11 BL-11 237969.9050 653712.2630 100.182 26+04.928 7.026 LT (BL-11 HAS BEEN DESTROYED) 12 BL-12 238051.8210 653880.2480 98.158 27+91.821 7.078 LT (BL-12 HAS BEEN DESTROYED) 13 BL-13 238112.0770 654003.8180 96.337 29+29.300 7.115 LT (BL-13 HAS BEEN DESTROYED) 14 BL-14 238170.9160 654125.6970 94.634 30+64.637 6.618 LT (BL-14 HAS BEEN DESTROYED) 15 BL-15 238257.1910 654302.4090 91.881 32+61.285 6.765 LT (BL-15 HAS BEEN DESTROYED) 16 BL-16 238340.1720 654472.1100 92.625 34+50.188 7.023 LT 17 BL-17 238425.9990 654648.7070 96.913 36+46.536 6.817 LT 18 BL-18 238488.6980 654777.2470 100.022 37+89.553 6.873 LT 19 BL-19 238552.9140 654910.1470 103.271 39+37.153 6.382 LT 20 BL-20 238595.4550 654995.9510 105.320 40+32.922 7.038 LT 21 BL-21 238660.0590 655132.3050 107.625 41+83.797 5.383 LT 22 BL-22 238744.4700 655301.4240 106.945 43+72.803 7.181 LT 23 BL-23 238816.3470 655453.3470 106.007 45+40.860 5.244 LT 24 BL-24 238868.6010 655560.0310 106.214 46+59.654 5.484 LT 25 BL-25 238950.8240 655725.6120 111.578 OUTSIDE PROJECT LIMITS 26 BL-26 239032.2630 655892.8860 115.503 OUTSIDE PROJECT LIMITS 27 BL-27 239116.9400 656067.7850 114.132 OUTSIDE PROJECT LIMITS 28 BL-28 239200.0170 656238.4800 112.612 OUTSIDE PROJECT LIMITS 29 BL-29 239286.3970 656383.5720 112.294 OUTSIDE PROJECT LIMITS 30 BL-30 239391.6660 656518.4530 118.199 OUTSIDE PROJECT LIMITS 31 BL-31 239473.7310 656592.8060 118.342 OUTSIDE PROJECT LIMITS 32 BL-32 239626.4090 656710.5150 119.022 OUTSIDE PROJECT LIMITS 33 BL-33 239776.4390 656820.8520 119.442 OUTSIDE PROJECT LIMITS 34 BL-34 239928.6740 656933.5000 119.777 OUTSIDE PROJECT LIMITS BY4 POINT DESC. NORTH EAST ELEVATION Y4 STATION OFFSET ----- ----- ----------- ----------- --------- ---------- -------- 42 BY4-2 237894.5704 654063.6021 94.457 OUTSIDE PROJECT LIMITS (BY4-2 NOT FOUND 6/05) 41 BY4-1 238038.0382 654143.6320 99.644 11+31.940 3.038 RT (BY4-1 REESTABLISHED SEE ADDITIONAL CONTROL REESSTABLISHED 4/09) 50 BY5-50 238191.6521 654121.0213 (BY5-50 NOT FOUND 6/05) (BY5-50 REESTABLISHED SEE ADDITIONAL CONTROL REESSTABLISHED 4/09) BY5 POINT DESC. NORTH EAST ELEVATION Y5 STATION OFFSET ----- ------ ----------- ----------- --------- ---------- -------- 50 BY5-50 238191.6521 654121.0213 93.521 10+23.625 17.194 LT (BY5-50 NOT FOUND 6/05) (BY5-50 REESTABLISHED SEE ADDITIONAL CONTROL REESSTABLISHED 4/09) 51 BY5-1 238302.9666 654133.3774 93.720 11+32.021 5.034 RT 52 BY5-2 238512.7508 654121.4077 86.479 OUTSIDE PROJECT LIMITS ADDITIONAL CONTROL ESTABLISHED 6/05 TO SUPPLEMENT POINTS NOT FOUND ALONG BASELINE, BY4 AND BY5 **************************************** 200 ELEVATION = 77.587 N 237497.785 E 652832.498 L STATION 16+05.973 6.978 LT BL-200 **************************************** **************************************** 201 ELEVATION = 78.669 N 237561.111 E 652933.382 L STATION 17+24.623 1.409 RT BL-201 **************************************** **************************************** 202 ELEVATION = 94.368 N 238199.773 E 654140.872 L STATION 30+90.920 25.912 LT BL-202 **************************************** **************************************** 203 ELEVATION = 94.499 N 237887.325 E 654065.510 L STATION 28+86.304 221.950 RT BY4-203 **************************************** ADDITIONAL CONTROL RE-ESTABLISHED 4/09 TO SUPPLEMENT POINTS NOT FOUND ALONG BASELINE, BY4 AND BY5 **************************************** 205 ELEVATION = 101.269 N 237889.8703 E 653563.2666 L STATION 24+35.928 0.348 LT BL-205 **************************************** **************************************** 206 ELEVATION = 98.970 N 238023.7162 E 653842.8486 L STATION 27+45.890 1.804 RT BL-206 **************************************** **************************************** 207 ELEVATION = 91.758 N 238259.5521 E 654309.7717 L STATION 32+68.938 5.663 LT BL-207 **************************************** **************************************** 241 ELEVATION = 99.672 N 238038.0305 E 654143.6542 L STATION 30+22.569 120.705 RT BY4-41 **************************************** **************************************** 250 ELEVATION = 93.458 N 238191.6350 E 654121.0397 L STATION 30+69.527 27.284 LT BY5-50 **************************************** BM POINT **************************************** BM62 ELEVATION = 102.835 N 238041 E 653728 L STATION 26+51 64 LEFT SPIKE SET IN BASE OF 475MM TWIN OAK TREE **************************************** **************************************** BM63 ELEVATION = 89.522 N 238329 E 654296 L STATION 32+87 74 LEFT SPIKE SET IN BASE OF 450MM POPLAR TREE **************************************** **************************************** BM64 ELEVATION = 107.808 N 238703 E 655083 L STATION 41+58 66 LEFT SPIKE SET IN BASE OF 375MM POPLAR TREE **************************************** **************************************** BM65 ELEVATION = 112.932 N 239111 E 655875 L STATION 47+30.00 N 48^58'05" E 330.199 "X" CUT IN CONCRETE BASE OF TOWER **************************************** **************************************** BM66 ELEVATION = 120.181 N 239456 E 656511 L STATION 47+30.00 N 57^35'46" E 1048.612 SPIKE SET IN BASE OF 600MM OAK TREE ****************************************