BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET -------------------------------------------------------------------------------- 100 BL-100 247035.370 648853.537 104.989 9+96.756 14.135 RT 101 BL-101 246980.158 649210.680 108.457 13+60.253 15.146 RT 102 BL-102 246923.726 649307.260 111.332 14+78.226 27.521 RT 103 BL-103 246901.153 649338.940 114.102 15+20.053 27.428 RT 104 BL-104 246849.762 649390.658 111.631 15+98.595 28.044 RT 105 BL-105 246805.880 649424.228 112.216 16+57.958 26.347 RT 106 BL-106 246752.733 649451.590 109.322 17+21.859 25.826 RT 107 BL-107 246697.459 649474.900 111.907 17+82.882 23.453 RT 108 BL-108 246636.901 649492.161 116.757 18+45.692 27.934 RT 109 BL-109 246579.476 649510.911 119.216 19+06.062 29.944 RT 110 BL-110 246522.443 649531.021 117.384 19+64.932 31.650 RT 111 BL-111 246464.580 649560.557 119.371 20+25.594 31.206 RT 112 BL-112 246411.811 649647.533 118.556 21+17.699 5.834 LT 113 BL-113 246350.070 649725.607 116.258 22+18.747 6.889 LT 114 BL-114 246291.206 649820.691 108.933 23+30.686 8.993 LT 115 BL-115 246259.032 649866.632 103.988 23+86.728 6.764 LT 116 BL-116 246216.389 649928.518 105.229 24+61.845 4.347 LT 117 BL-117 246155.585 650023.083 105.624 25+74.271 4.320 LT 118 BL-118 246124.564 650071.437 105.856 26+31.720 4.365 LT 119 BL-119 246066.804 650158.467 100.234 27+36.162 2.825 LT 120 BL-120 245995.573 650276.307 101.233 28+73.806 6.609 LT 121 BL-121 245939.555 650359.746 97.936 29+74.402 4.262 LT 122 BL-122 245901.681 650449.786 92.789 30+73.694 7.568 LT 123 BL-123 245888.070 650508.291 89.775 31+35.001 7.637 LT 124 BL-124 245873.483 650617.773 75.526 32+45.928 1.286 LT 125 BL-125 245869.397 650698.995 88.523 33+27.252 1.601 LT 126 BL-126 245865.191 650818.700 93.308 34+47.009 3.879 LT 127 BL-127 245838.500 650873.854 89.659 35+03.527 19.788 RT 16 NOT SET 245836.823 650915.286 UNKNOWN 35+44.989 19.214 RT 176 BL-176 245835.707 650943.127 84.463 35+72.850 18.828 RT 128 BL-128 245833.608 651003.847 79.510 36+33.594 17.638 RT 129 BL-129 245828.526 651143.191 71.122 37+73.009 15.172 RT 17 NOT SET 245823.629 651271.557 UNKNOWN 39+01.452 13.115 RT 130 BL-130 245822.428 651302.909 71.039 39+32.823 12.617 RT 131 BL-131 245821.031 651366.524 85.737 39+96.185 10.958 RT 132 BL-132 245821.588 651459.554 87.337 40+88.370 11.060 RT 133 BL-133 245829.682 651550.556 94.676 41+78.906 10.768 RT 134 BL-134 245838.380 651603.606 93.766 42+32.189 9.946 RT 135 BL-135 245916.561 651895.558 97.994 45+33.372 12.029 RT 136 BL-136 245966.981 652111.916 80.291 47+56.940 16.631 RT 137 BL-137 245989.042 652270.448 95.097 49+18.276 21.240 RT 138 BL-138 245999.611 652401.196 98.919 50+50.727 24.303 RT 139 BL-139 245997.450 652497.256 104.101 51+47.697 31.721 RT 140 BL-140 245998.963 652674.896 106.059 53+27.733 29.377 RT 141 BL-141 245993.830 652768.675 111.741 54+22.837 28.529 RT 142 BL-142 245980.952 652892.796 116.297 55+49.156 27.549 RT 143 BL-143 245965.366 652957.630 118.934 56+16.485 33.087 RT 144 BL-144 245941.894 653093.347 122.384 57+55.997 29.521 RT 145 BL-145 245944.987 653220.369 119.216 58+79.134 1.806 LT 18 NOT SET 245940.888 653260.647 UNKNOWN 59+19.312 6.788 LT 146 BL-146 245931.766 653350.347 118.036 60+08.789 17.889 LT 147 BL-147 245906.620 653482.262 108.127 61+44.231 20.742 LT 148 BL-148 245877.781 653783.278 97.642 64+49.995 2.463 LT 149 BL-149 245892.644 653881.064 90.604 65+49.189 3.709 LT 19 NOT SET 245905.509 653947.646 UNKNOWN 66+17.178 2.411 LT 150 BL-150 245919.831 654021.770 87.546 66+92.412 3.650 RT 151 BL-151 245935.904 654082.396 87.936 67+55.014 6.755 RT 152 BL-152 245989.173 654237.994 93.152 69+19.447 3.585 RT 153 BL-153 246032.509 654363.024 97.891 70+51.739 0.532 RT 154 BL-154 246100.151 654558.609 93.534 72+58.639 4.102 LT 155 BL-155 246144.289 654686.494 86.866 73+94.020 6.746 LT 156 BL-156 246175.199 654774.925 80.132 74+88.091 3.673 LT 157 BL-157 246197.945 654842.780 90.242 75+59.210 4.485 RT 158 BL-158 246211.927 654885.097 93.544 76+03.325 10.744 RT 159 BL-159 246259.196 655023.880 96.109 77+48.662 30.039 RT 160 BL-160 246291.870 655146.828 97.412 78+81.083 48.778 RT 161 BL-161 246303.652 655294.727 102.591 80+44.436 62.587 RT 162 BL-162 246299.317 655359.303 103.644 81+16.859 65.335 RT 163 BL-163 246292.868 655428.468 100.029 81+93.496 61.574 RT 177 BL-177 246288.303 655467.857 97.296 82+34.229 57.747 RT 164 BL-164 246282.058 655525.217 94.036 82+91.588 51.324 RT 165 BL-165 246272.303 655623.330 90.672 OUTSIDE PROJECT LIMITS 166 BL-166 246255.906 655718.504 81.309 OUTSIDE PROJECT LIMITS 167 BL-167 246239.388 655829.868 89.949 OUTSIDE PROJECT LIMITS BY1 POINT DESC. NORTH EAST ELEVATION Y1 STATION OFFSET -------------------------------------------------------------------------------- A101 BL-167 246980.158 649210.680 108.457 10+18.357 135.356 RT 1 MON1A GPS 246978.108 649241.311 108.408 10+49.032 134.108 RT 2 R2809-1 GPS 246936.310 649553.819 104.984 13+97.032 10.305 RT 40 BY1-40 246903.832 649797.775 107.253 16+42.519 1.459 RT 39 BY1-39 246901.985 649892.344 109.552 17+17.880 45.598 LT 38 BY1-38 246919.217 650029.968 112.675 18+11.607 147.836 LT 37 BY1-37 246981.866 650191.558 113.364 18+94.193 300.203 LT 36 BY1-36 247050.788 650360.117 110.993 OUTSIDE PROJECT LIMITS BY2 POINT DESC. NORTH EAST ELEVATION Y2 STATION OFFSET -------------------------------------------------------------------------------- 27 BY2-27 246371.355 649319.787 122.623 18+96.947 93.594 LT 28 BY2-28 246410.879 649421.433 122.244 19+87.162 52.604 LT 29 BY2-29 246452.067 649544.795 120.359 21+07.995 14.847 LT A111 BL-111 246464.580 649560.557 119.371 21+28.060 16.408 LT 30 BY2-30 246519.264 649690.590 115.060 22+66.443 10.961 RT 31 BY2-31 246572.786 649776.832 111.537 23+66.662 16.986 RT 32 BY2-32 246624.551 649835.090 112.323 24+42.480 17.303 RT 33 BY2-33 246824.189 650005.089 114.570 27+02.815 32.947 RT BY2A POINT DESC. NORTH EAST ELEVATION Y2 STATION OFFSET -------------------------------------------------------------------------------- 300 245790.1550 649055.0990 120.012 12+83.612 28.507 LT 201 245782.2361 649082.1384 120.411 12+86.886 0.532 LT 202 245847.4916 649126.4150 123.277 13+65.447 9.761 RT 203 245888.4506 649135.1204 122.470 14+05.521 2.410 LT 204 245944.2070 649170.0008 117.309 14+71.191 1.181 RT 205 245984.6577 649189.7089 113.002 15+16.129 1.115 LT 206 246020.7797 649212.6384 109.887 15+58.834 1.503 RT 207 246054.4943 649228.7472 113.346 15+96.135 0.688 LT 208 246089.0328 649247.2493 113.719 16+35.314 1.182 LT 209 246118.2280 649264.2052 112.452 16+69.068 0.447 LT 210 246156.7105 649286.6077 116.932 17+13.584 0.568 RT 211 246189.7084 649306.9394 117.897 17+52.321 2.342 RT 212 246234.2074 649330.8829 120.113 18+02.861 0.232 LT 213 246271.1150 649359.6146 119.359 18+49.663 1.579 RT 214 246302.8745 649384.3131 118.090 18+89.939 0.195 RT 215 246343.1764 649419.2883 120.285 19+43.107 2.926 LT 216 246385.5618 649474.2660 119.858 20+12.331 0.218 LT 217 246399.8058 649498.8216 119.203 20+40.616 2.558 RT 218 246419.7130 649519.2356 120.197 20+68.718 2.320 LT 301 246464.5800 649560.5570 119.371 21+28.060 16.408 LT BY3 POINT DESC. NORTH EAST ELEVATION Y3 STATION OFFSET -------------------------------------------------------------------------------- 42 BY3-42 246774.644 649283.588 119.562 OUTSIDE PROJECT LIMITS 41 BY3-41 246907.438 649234.140 112.429 OUTSIDE PROJECT LIMITS B101 BL-101 246980.158 649210.680 108.457 OUTSIDE PROJECT LIMITS 43 BY3-43 247063.945 649206.052 103.812 10+67.216 3.091 LT 44 BY3-44 247221.564 649197.526 93.460 12+25.098 4.978 LT BY3 POINT DESC. NORTH EAST ELEVATION Y3A STATION OFFSET -------------------------------------------------------------------------------- 42 BY3-42 246774.644 649283.588 119.562 OUTSIDE PROJECT LIMITS 41 BY3-41 246907.438 649234.140 112.429 11+01.372 5.289 LT B101 BL-101 246980.158 649210.680 108.457 11+77.397 10.754 LT 43 BY3-43 247063.945 649206.052 103.812 OUTSIDE PROJECT LIMITS 44 BY3-44 247221.564 649197.526 93.460 OUTSIDE PROJECT LIMITS BY4 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET -------------------------------------------------------------------------------- 11 BL-167 244977.817 650949.596 85.703 36+25.735 875.111 RT 6 R2809-5 GPS 245466.555 650876.194 72.362 35+25.992 391.061 RT A16 NOT SET 245836.830 650915.286 UNKNOWN 35+44.989 19.213 RT 5 R2809-4 GPS 245931.347 650925.265 87.510 35+49.838 75.705 LT 13 BY4-13 246306.727 650979.192 98.198 35+83.372 453.453 LT 14 BY4-14 246610.996 651023.040 103.218 36+10.690 759.649 LT 15 BY4-15 246919.256 651067.215 108.209 36+38.118 1069.848 LT BY5 POINT DESC. NORTH EAST ELEVATION Y2 STATION OFFSET -------------------------------------------------------------------------------- 20 BY5-20 245497.894 649015.840 115.946 9+94.351 5.788 LT 21 BY5-21 245790.155 649055.099 120.012 12+83.612 28.507 LT 21 BY5-22 245856.688 649055.308 121.488 13+40.084 57.124 LT 23 BY5-23 245955.386 649034.107 120.963 14+15.303 123.193 LT 24 BY5-24 246036.556 649043.109 121.150 14+90.716 154.539 LT 25 BY5-25 246115.615 649073.684 122.420 15+74.705 165.979 LT BY6 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET -------------------------------------------------------------------------------- 78 BY6-78 246357.866 651025.460 99.338 36+26.805 507.021 LT 77 BY6-77 246568.776 651057.138 100.887 36+47.023 719.337 LT BY7 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET -------------------------------------------------------------------------------- 69 BY7-69 245609.147 653068.445 117.689 58+05.888 359.448 RT 68 BY7-68 245863.441 653086.181 119.949 57+66.498 107.598 RT A144 BL-144 245941.894 653093.347 122.384 57+55.997 29.521 RT 70 BY7-70 246145.382 653160.245 123.174 57+75.856 183.759 LT 71 BY7-71 246281.567 653197.516 121.914 57+81.834 324.825 LT BY8 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET -------------------------------------------------------------------------------- 74 BY8-74 245769.087 653245.067 114.374 59+42.417 164.163 R A18 NOT SET 245940.888 653260.647 UNKNOWN 59+19.312 6.788 LT 73 BY8-73 246122.221 653277.091 116.279 58+94.924 187.225 LT BY9 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET -------------------------------------------------------------------------------- 53 BY9-53 246012.262 655568.824 82.270 OUTSIDE PROJECT LIMITS 52 BY9-52 246126.087 655509.226 90.367 83+10.022 207.025 RT 51 BY9-51 246223.936 655472.445 96.605 82+52.773 119.562 RT A177 BL-177 246288.303 655467.857 97.289 82+34.229 57.747 RT 50 BY9-50 246340.265 655464.331 97.225 82+19.433 7.780 RT A61 BY10-61 246470.723 655456.538 100.315 81+86.703 118.348 LT BY10 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET -------------------------------------------------------------------------------- 63 BY10-63 246673.764 655152.756 88.080 79+60.375 321.386 LT 62 BY10-62 246541.916 655349.099 101.632 80+93.072 176.132 LT 61 BY10-61 246470.723 655456.538 100.315 81+86.703 118.348 LT 60 BY10-60 246387.095 655580.612 90.215 83+22.723 63.271 LT 59 BY10-59 246312.283 655719.579 83.280 OUTSIDE PROJECT LIMITS 58 BY10-58 246255.659 655874.790 91.040 OUTSIDE PROJECT LIMITS 57 BY10-57 246224.691 656010.289 100.920 OUTSIDE PROJECT LIMITS 56 BY10-56 246209.864 656134.130 108.385 OUTSIDE PROJECT LIMITS BY10 POINT DESC. NORTH EAST ELEVATIO LDET STATION OFFSET -------------------------------------------------------------------------------- 63 BY10-63 246673.764 655152.756 88.080 OUTSIDE PROJECT LIMITS 62 BY10-62 246541.916 655349.099 101.632 OUTSIDE PROJECT LIMITS 61 BY10-61 246470.723 655456.538 100.315 OUTSIDE PROJECT LIMITS 60 BY10-60 246387.095 655580.612 90.215 OUTSIDE PROJECT LIMITS 59 BY10-59 246312.283 655719.579 83.280 11+19.102 1.141 LT 58 BY10-58 246255.659 655874.790 91.040 12+87.175 24.620 R 57 BY10-57 246224.691 656010.289 100.920 14+27.709 4.730 LT 56 BY10-56 246209.864 656134.130 108.385 OUTSIDE PROJECT LIMITS ================================================================================ **************************************** 310 ELEVATION = 106.784 N 247101 E 648993 L STATION 11+26 70 LEFT (BM10) RR SPIKE IN 10" MAPLE **************************************** **************************************** 311 ELEVATION = 116.619 N 246753 E 649387 L STATION 16+91 84 RIGHT (BM11) RR SPIKE IN 12" OAK **************************************** **************************************** 312 ELEVATION = 107.828 N 246283 E 649961 L STATION 24+53 78 LEFT (BM12) RR SPIKE IN 14" OAK **************************************** **************************************** 313 ELEVATION = 76.276 N 245794 E 650575 L STATION 32+07 80 RIGHT (BM13) RR SPIKE IN 14" OAK **************************************** **************************************** 314 ELEVATION = 73.776 N 245916 E 651230 L STATION 38+55 77 LEFT (BM14) RR SPIKE IN 18" PINE **************************************** **************************************** 315 ELEVATION = 77.920 N 246133 E 652053 L STATION 47+34 158 LEFT (BM15) RR SPIKE IN 24" OAK **************************************** **************************************** 316 ELEVATION = 119.987 N 246019 E 652987 L STATION 56+37 25 LEFT (BM16) RR SPIKE IN 26" PINE **************************************** **************************************** 317 ELEVATION = 97.730 N 245755 E 653750 L STATION 64+10 117 RIGHT (BM17) RR SPIKE IN 30" HICKORY **************************************** **************************************** 318 ELEVATION = 89.364 N 246071 E 654622 L STATION 73+10 43 RIGHT (BM18) RR SPIKE IN 14" PINE **************************************** **************************************** 321 ELEVATION = 114.772 N 246776 E 649973 Y2 STATION 26+43 35 RIGHT (BM21) RR SPIKE IN 28" MAPLE ****************************************