RBL POINT DESC. NORTH EAST ELEVATION NBL STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 21 BL-21 161625.5610 2278685.1890 29.99 43+68.55 50.88 RT 106 RBL-106 162224.8880 2278506.7630 30.15 49+90.99 6.66 LT 107 RBL-107 162465.5920 2278310.4140 30.71 52+80.46 130.44 LT 108 RBL-108 162786.4790 2278256.2920 30.51 56+08.40 72.98 LT 109 RBL-109 163033.6620 2278136.8230 21.33 58+87.73 83.16 LT 110 RBL-110 163313.3730 2278022.5820 33.68 61+93.16 55.69 LT 111 RBL-111 163657.1570 2277829.6740 26.38 65+87.72 54.51 LT 112 RBL-112 163969.0720 2277636.6620 26.55 69+54.25 68.88 LT RBL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 113 RBL-113 164473.7790 2277364.7670 36.06 102+89.93 2.25 LT 114 RBL-114 164775.8740 2277235.6040 38.95 106+18.42 2.75 LT 115 RBL-115 165101.4290 2277161.6770 38.42 109+52.58 2.19 RT 116 RBL-116 165465.0330 2277142.0700 41.44 113+17.86 4.62 RT 117 RBL-117 165886.1060 2277191.8000 40.75 117+42.54 4.94 LT 118 RBL-118 166316.1640 2277360.8710 39.55 122+05.04 0.56 LT 119 RBL-119 166552.1400 2277522.2570 38.51 124+91.74 12.21 RT 120 RBL-120 166863.5960 2277791.4810 44.10 129+05.77 3.80 RT 121 RBL-121 167154.1170 2278137.7750 41.85 133+57.88 6.81 LT 122 RBL-122 167346.9320 2278400.5370 36.21 136+83.69 1.84 RT 123 RBL-123 167513.4230 2278574.5990 40.30 139+24.76 8.14 LT 124 RBL-124 167794.9340 2278834.1570 36.65 143+08.41 2.78 RT 125 RBL-125 168012.9100 2278976.6750 32.78 145+68.62 3.46 RT 126 RBL-126 168184.3800 2279215.1870 40.86 148+21.10 139.96 RT 34 BL-34 168650.4720 2279379.1000 40.38 152+86.05 154.43 RT 35 BL-35 169536.5520 2279221.9800 46.86 161+48.78 25.77 LT 36 BL-36 170430.7620 2279118.5880 52.18 170+48.58 6.23 LT 37 BL-37 171329.4170 2279070.3940 56.10 179+48.60 3.66 RT 38 BL-38 172229.2790 2279076.8950 64.35 188+48.78 1.20 LT 39 BL-39 173124.0690 2279112.4730 59.52 197+44.28 1.20 LT 40 BL-40 174027.6600 2279148.1560 57.68 206+48.57 1.45 LT 41 BL-41 174928.0060 2279184.2890 59.53 215+49.64 1.11 LT 42 BL-42 175826.4330 2279219.1840 60.40 224+48.75 1.94 LT 43 BL-43 176725.4330 2279256.8970 59.76 233+48.53 0.02 RT 44 BL-44 177614.1000 2279289.5920 61.84 242+37.80 2.62 LT 45 BL-45 178524.0710 2279325.8360 60.59 251+48.49 2.56 LT 46 BL-46 179424.1360 2279349.3500 60.67 260+49.14 3.90 LT 47 BL-47 179933.8000 2279328.6210 60.30 265+59.56 7.53 LT 48 BL-48 180322.9300 2279301.2880 60.10 269+49.89 3.88 LT 49 BL-49 181213.5160 2279170.9320 62.99 278+50.64 3.86 LT 50 BL-50 182087.8080 2278958.3210 63.05 287+51.13 5.02 LT 51 BL-51 182949.3710 2278698.2140 72.82 296+51.17 2.98 LT 52 BL-52 183810.3230 2278434.4160 69.08 305+51.63 3.80 LT 53 BL-53 184301.3300 2278307.1010 71.44 310+58.88 5.04 RT 54 BL-54 184664.7210 2278216.4870 70.21 314+33.43 1.71 LT RBY3 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 196 RBY3-196 165655.4375 2276899.2967 44.58 114+79.86 251.66 LT A116 RBL-116 165465.0330 2277142.0700 41.44 113+17.86 4.62 RT 197 RBY3-197 165208.9290 2277551.5680 37.20 110+11.35 403.23 RT BY0 POINT DESC. NORTH EAST ELEVATION SVRD2 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- A205 BY0-205 161460.2195 2279171.6012 25.45 75+76.92 46.72 LT 255 BY0-255 161163.0323 2279346.1119 23.55 74+91.46 288.09 RT BY01 POINT DESC. NORTH EAST ELEVATION SVRD2 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- A2 R2633AB-2 157482.8420 2276800.9270 25.13 29+17.82 551.70 LT 210 BY01-210 156898.1164 2277032.2506 21.53 24+43.78 138.54 LT 211 BY01-211 156312.4547 2277312.0410 21.48 19+85.02 320.61 RT BY02 POINT DESC. NORTH EAST ELEVATION Y02 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 212 BY02-212 158071.7443 2275933.5882 32.45 16+29.90 16.47 RT 213 BY02-213 157750.7371 2276460.7158 24.99 10+66.06 109.21 LT B2 R2633AB-2 157482.8420 2276800.9270 25.13 OUTSIDE PROJECT LIMITS BY03 POINT DESC. NORTH EAST ELEVATION SVRD2 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- A202 BY03-202 158184.7355 2277172.7023 21.59 38+25.49 191.47 LT 253 BY03-253 158252.6197 2277384.0512 19.43 38+91.04 17.14 RT 254 BY03-254 157957.7712 2277662.8522 22.17 35+54.81 267.05 RT BY04 POINT DESC. NORTH EAST ELEVATION Y04 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- B202 BY04-202 158184.7355 2277172.7023 21.59 20+96.78 609.27 RT 247 BY04-247 158814.8303 2277125.9707 15.69 26+44.43 294.17 RT 248 BY04-248 159277.1157 2277089.3556 22.51 30+21.94 100.87 RT 249 BY04-249 159794.6178 2277051.3633 29.42 35+24.21 21.04 RT 250 BY04-250 160364.0273 2277080.5944 33.89 40+94.34 14.82 RT 251 BY04-251 160848.5120 2277082.9670 37.74 OUTSIDE PROJECT LIMITS BY05 POINT DESC. NORTH EAST ELEVATION SVRD2 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- A266 BY05-266 160551.7575 2278500.2873 24.80 64+56.85 54.08 LT 267 BY05-267 160293.6911 2278757.0331 22.90 63+56.80 295.93 RT BY2 POINT DESC. NORTH EAST ELEVATION Y2 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- A4 R2633AB-4 163101.2690 2281510.1010 19.54 21+54.27 39.54 RT 209 BY2-209 162595.6615 2282313.6632 29.53 11+79.65 15.63 LT RBY1 POINT DESC. NORTH EAST ELEVATION Y1 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 199 RBY1-199 154793.2442 2275930.0291 15.90 12+15.45 14.86 LT 200 RBY1-200 155377.4457 2276060.8106 17.60 18+14.11 13.62 LT 3 R2633AB-3 155960.0070 2276068.1900 21.09 23+84.46 132.51 LT 201 RBY-201 156687.1932 2276378.2394 21.82 31+60.67 15.35 LT 2 R2633AB-2 157482.8420 2276800.9270 25.13 40+60.81 0.54 RT 202 RBY1-202 158184.7355 2277172.7023 21.59 48+55.26 15.61 LT 203 RBY1-203 159200.7666 2277740.0502 21.83 59+66.60 229.61 RT 204 RBY1-204 159942.3136 2278171.3826 23.57 67+61.21 552.61 RT 266 RBY1-266 160551.7575 2278500.2873 24.80 75+84.72 773.80 RT A20 BL-20 160790.6150 2278629.2350 25.99 82+36.79 740.30 RT 205 RBY1-205 161460.2195 2279171.6012 25.45 92+67.52 288.11 RT 206 RBY1-206 161906.9526 2279712.2103 13.89 98+96.27 75.66 RT 207 RBY1-207 162323.4542 2280267.4213 12.92 105+83.82 8.89 RT 208 RBY1-208 162702.9471 2280832.9875 15.70 112+64.46 15.82 LT 4 R2633AB-4 163101.2690 2281510.1010 19.54 120+49.83 2.21 RT 198 RBY1-198 163525.9124 2282196.1601 29.65 128+56.68 2.57 RT **************************************** BM20 ELEVATION = 27.74 N 160707 E 2278743 NBL STATION 35+02 145 RIGHT RR SPIKE SET IN THE BASE OF A 9" PINE **************************************** **************************************** BM109 ELEVATION = 21.66 N 163161 E 2278286 NBL STATION 59+37 107 RIGHT R.R. SPIKE SET IN THE BASE OF AN 18" PINE **************************************** **************************************** BM114 ELEVATION = 43.12 N 164699 E 2277000 L STATION 106+20 250 LEFT R. R. SPIKE SET IN THA BASE OF AN 10" PINE **************************************** **************************************** BM120 ELEVATION = 43.18 N 166720 E 2277958 L STATION 129+36 222 RIGHT R.R. SPIKE SET IN THE BASE OF 15" PINE **************************************** **************************************** BM126 ELEVATION = 41.66 N 168124 E 2279427 L STATION 148+46 358 RIGHT R.R. SPIKE SET IN THE BASE OF AN 15" PINE **************************************** **************************************** BM36 ELEVATION = 53.24 N 170499 E 2279207 L STATION 171+08 89 RIGHT RR SPIKE SET AT THE BASE OF A 12" & 6" TWIN PINE **************************************** **************************************** BM38 ELEVATION = 59.73 N 172286 E 2279222 L STATION 189+11 141 RIGHT RR SPIKE SET AT THE BASE OF A 5" PINE **************************************** **************************************** BM40 ELEVATION = 61.09 N 173993 E 2279063 L STATION 206+10 86 LEFT RR SPIKE SET AT THE BASE OF A 6" PINE **************************************** **************************************** BM44 ELEVATION = 64.38 N 177541 E 2279084 L STATION 241+57 205 LEFT RR SPIKE SET AT THE BASE OF A 7" PINE **************************************** **************************************** BM47 ELEVATION = 60.87 N 179812 E 2279582 L STATION 264+26 239 RIGHT RR SPIKE SET AT THE BASE OF A 7" PINE **************************************** **************************************** BM8 ELEVATION = 63.35 N 176064 E 2278879 L STATION 226+73 351 LEFT RR SPIKE SET AT THE BASE OF A 7" PINE **************************************** **************************************** BM50 ELEVATION = 64.92 N 181891 E 2278829 L STATION 285+95 183 LEFT RR SPIKE SET AT THE BASE OF A 18" PINE **************************************** **************************************** BM52 ELEVATION = 74.09 N 183487 E 2278395 L STATION 302+54 136 LEFT RR SPIKE AT THE BASE OF A 12" PINE **************************************** **************************************** BM211 ELEVATION = 24.15 N 156197 E 2277338 SVRD2 STATION 18+96 384 RIGHT RR SPIKE SET AT THE BASE OF A 12" PINE **************************************** **************************************** BM2 ELEVATION = 23.90 N 157582 E 2276634 Y04 STATION 11+87 43 LEFT RR SPIKE SET IN THE BASE OF A 11" PINE **************************************** **************************************** BM212 ELEVATION = 33.69 N 158042 E 2275834 Y02 STATION 17+24 30 LEFT RR SPIKE SET IN THE BASE OF A 15" OAK **************************************** **************************************** BM248 ELEVATION = 23.84 N 159322 E 2276872 Y04 STATION 30+27 121 LEFT RR SPIKE SET AT THE BASE OF A 14" GUM **************************************** **************************************** BM251 ELEVATION = 37.98 N 160873 E 2277115 Y04 STATION 43+48 N 7^ 33' 29.8" E Dist 256.81 RR SPIKE SET IN THE BASE OF A 7" PINE **************************************** **************************************** BM4 ELEVATION = 19.14 N 163130 E 2281273 Y1 STATION 118+63 147 LEFT RR SPIKE SET IN THE BASE OF A 14" PINE **************************************** **************************************** BM203 ELEVATION = 19.54 N 159015 E 2277795 Y1 STATION 57+98 312 RIGHT RR SPIKE SET AT THE BASE OF A 13" PINE **************************************** **************************************** BM207 ELEVATION = 16.00 N 162378 E 2280137 Y1 STATION 105+02 106 LEFT RR SPIKE SET IN THE BASE OF A 10" OAK ****************************************