BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 145 (R2303C) BL-145 442958.9145 2167616.3083 132.86 1093+32.89 15.65 LT 146 (R2303C) BL-146 443257.6064 2168115.6657 146.57 1099+14.76 16.09 LT 147 (R2303C) BL-147 443610.9612 2168709.9855 131.46 1106+06.19 14.78 LT 148 (R2303C) BL-148 443994.8859 2169354.3462 141.53 1113+56.25 14.07 LT 149 (R2303C) BL-149 444376.8702 2169959.5221 146.87 1120+73.24 14.69 LT C9 R2303C-9 444889.6540 2170588.9620 151.14 1128+87.44 15.52 LT C10 R2303C-10 445680.9800 2171469.8490 157.24 1140+71.57 16.27 LT BL15 BL-15 445810.9220 2171613.8180 159.56 1142+65.50 16.84 LT BL16 BL-16 446313.2880 2172182.4690 168.55 1150+24.25 11.02 LT BL17 BL-17 446750.3330 2172628.9020 167.76 1156+50.42 13.89 LT BL18 BL-18 447344.4490 2173131.2400 162.33 1164+29.41 13.92 LT BL19 BL-19 447916.1730 2173600.7110 161.06 1171+69.19 14.70 LT BL20 BL-20 448615.6720 2174173.3840 163.38 1180+73.20 16.99 LT BL21 BL-21 449123.6750 2174561.0230 164.70 1187+04.32 59.58 LT BL22 BL-22 449377.6200 2175189.0420 158.57 1193+73.46 55.55 RT BL23 BL-23 449613.3970 2175768.3500 145.87 1199+99.32 55.82 RT BL24 BL-24 449866.2250 2176395.2040 152.85 1206+75.24 58.03 RT BL25 BL-25 450097.9180 2176958.5790 153.88 1212+84.39 55.87 RT BL26 BL-26 450325.4330 2177518.3380 140.35 1218+88.62 56.22 RT BL27 BL-27 450537.4610 2178037.2140 129.75 1224+49.14 55.50 RT BL28 BL-28 450915.4140 2178969.9500 156.26 1234+55.55 57.15 RT BL29 BL-29 451201.2710 2179673.1940 160.35 1242+20.73 14.21 RT BL30 BL-30 451451.4060 2180284.2380 160.43 1248+03.13 231.77 LT D4 R2303D-4 451802.2540 2181172.0830 164.95 1257+88.17 681.16 LT BL31 BL-31 451948.0320 2181529.5790 164.51 1263+38.55 753.81 LT BL32 BL-32 452307.5410 2182395.2020 127.58 1274+84.18 617.44 LT BL33 BL-33 452555.8860 2183000.6460 108.47 1281+21.89 470.60 LT BL34 BL-34 452782.4070 2183562.9120 94.86 1287+11.75 330.88 LT BL35 BL-35 452874.4020 2183858.2870 93.03 1290+04.94 235.55 LT BL36 BL-36 452982.0690 2184364.0190 93.36 1294+73.00 65.52 LT BL37 BL-37 453193.5240 2185402.8920 92.89 1305+25.14 41.34 RT D6 R2303D-6 453353.2200 2186186.3710 93.79 1313+24.73 41.95 RT D7 R2303D-7 453541.1810 2187177.5500 94.34 1323+37.62 2.33 LT BL38 BL-38 453537.4020 2187743.7310 96.68 1329+03.47 9.16 LT BL39 BL-39 453398.9710 2188749.0480 126.31 1339+17.33 16.08 LT BL40 BL-40 453096.2540 2189640.9350 150.84 1348+57.50 35.44 RT BL41 BL-41 452809.2280 2190656.8260 161.69 1359+13.14 28.83 RT BL55 BL-55 452734.7203 2190919.3032 163.91 1361+85.98 27.45 RT BL42 BL-42 452507.8140 2191718.6540 161.45 1370+11.52 49.51 RT D8 R2303D-8 452479.8170 2192651.5430 159.09 1379+38.71 43.61 RT BL43 BL-43 452483.6320 2193259.9840 158.53 1385+47.15 39.38 RT BL44 BL-44 452478.6880 2193839.0860 155.63 1391+26.26 43.92 RT BL45 BL-45 452464.0820 2194429.4510 154.87 1397+16.63 58.12 RT BL46 BL-46 452474.0630 2195023.6500 154.01 1403+10.82 47.73 RT BL47 BL-47 452520.1980 2195874.0070 154.76 1411+54.34 46.76 RT BL48 BL-48 452759.2760 2196460.6970 158.09 1417+78.79 37.26 RT BL49 BL-49 453044.9510 2197007.8180 164.80 1423+96.00 36.90 RT BL50 BL-50 453209.8690 2197349.7530 163.28 1427+75.45 48.75 RT BL51 BL-51 453433.0750 2197764.3480 160.01 1432+46.27 42.51 RT BL52 BL-52 453628.2560 2198138.5230 151.87 1436+68.29 42.43 RT BL56 NOT SET 453773.6130 2198405.1047 UNKNOWN 1439+71.87 36.79 RT BL53 BL-53 453886.3490 2198611.8600 141.26 1442+07.32 32.42 RT BL54 BL-54 454326.1910 2199450.0060 129.29 1451+53.87 29.90 RT BY POINT DESC. NORTH EAST ELEVATION Y40 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY60 BY-60 446482.7280 2171295.8110 164.55 OUTSIDE PROJECT LIMITS BY15 BL-15 445810.9220 2171613.8180 159.60 14+83.16 34.50 RT BY1 POINT DESC. NORTH EAST ELEVATION Y41 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY16 BL-16 446313.2880 2172182.4690 168.58 OUTSIDE PROJECT LIMITS BY61 BY1-61 445704.2040 2172138.5670 157.77 15+33.88 14.42 RT BY2 POINT DESC. NORTH EAST ELEVATION Y42 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY62 BY2-62 449709.6440 2174248.9250 160.20 OUTSIDE PROJECT LIMITS BY21 BL-21 449123.6750 2174561.0230 164.70 13+72.42 4.46 LT BY63 BY2-63 448259.3940 2174662.3840 159.05 OUTSIDE PROJECT LIMITS BY3 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY64 BY3-64 452786.4540 2180110.8900 166.35 1246+03.02 1546.92 LT D5 R2303D-5 452530.8070 2180385.4930 167.05 1247+68.56 1314.91 LT BY65 BY3-65 452265.0700 2180668.6920 167.63 1250+11.33 1100.53 LT BY4 R2303D-4 451802.2540 2181172.0830 164.95 1257+88.17 681.16 LT BY4 POINT DESC. NORTH EAST ELEVATION Y43 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY66 BY4-66 453153.0590 2181369.1050 149.06 OUTSIDE PROJECT LIMITS BY67 BY4-67 452429.0860 2181476.8170 160.45 OUTSIDE PROJECT LIMITS BY31 BL-31 451948.0320 2181529.5790 164.51 OUTSIDE PROJECT LIMITS BY68 BY4-68 451527.2180 2181622.3100 153.72 12+20.08 14.39 LT BY69 BY4-69 451211.4210 2181739.9030 150.73 15+58.17 13.95 LT BY70 BY4-70 450585.2340 2181832.7410 145.27 OUTSIDE PROJECT LIMITS BY5 POINT DESC. NORTH EAST ELEVATION Y44 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY34 BL-34 452782.4070 2183562.9120 94.86 10+23.38 28.79 RT BY71 BY5-71 452438.0030 2183651.5890 95.12 13+60.84 64.72 RT BY72 BY5-72 452172.8930 2183707.4210 93.88 16+96.47 39.75 RT BY73 BY5-73 451757.2510 2183705.8140 96.04 OUTSIDE PROJECT LIMITS BY6 POINT DESC. NORTH EAST ELEVATION Y45 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY74 BY6-74 453732.9880 2189672.6050 149.38 OUTSIDE PROJECT LIMITS BY40 BL-40 453096.2540 2189640.9350 150.84 15+35.07 19.25 RT BY75 BY6-75 452527.9170 2189615.2230 157.33 OUTSIDE PROJECT LIMITS BY7 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY55 BL-55 452734.7203 2190919.3032 163.91 1361+85.98 27.45 RT BY76 BY7-76 452067.3945 2190663.7336 156.31 1361+25.95 739.51 RT BY8 POINT DESC. NORTH EAST ELEVATION Y46 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY78 BY8-78 453286.2920 2191393.6360 164.18 OUTSIDE PROJECT LIMITS BY79 BY8-79 452768.4610 2191735.5480 158.59 12+60.39 33.46 LT BY42 BL-42 452507.8140 2191718.6540 161.44 15+12.02 27.95 LT BY9 POINT DESC. NORTH EAST ELEVATION Y47 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY8 R2303D-8 452479.8170 2192651.5430 159.09 10+47.07 52.54 RT BY80 BY9-80 451946.5980 2192638.5370 158.16 OUTSIDE PROJECT LIMITS BY10 POINT DESC. NORTH EAST ELEVATION Y48 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY44 BL-44 452478.6880 2193839.0860 155.63 10+44.00 51.84 LT BY81 BY10-81 452023.0340 2193765.4980 159.17 OUTSIDE PROJECT LIMITS BY11 POINT DESC. NORTH EAST ELEVATION Y49 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY82 BY11-82 453365.9370 2196013.9860 156.68 OUTSIDE PROJECT LIMITS BY83 BY11-83 452897.7270 2196298.3990 156.94 10+67.17 19.26 RT BY48 BL-48 452759.2760 2196460.6970 158.09 12+69.44 48.53 LT BY12 POINT DESC. NORTH EAST ELEVATION Y50 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY50 BL-50 453209.8690 2197349.7530 163.28 13+39.07 30.95 LT BY84 BY12-84 452630.7590 2197439.0130 172.75 19+20.65 20.26 LT BY13 POINT DESC. NORTH EAST ELEVATION Y52 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY85 BY13-85 455910.3930 2197791.4610 118.72 11+59.10 47.09 RT BY86 BY13-86 455332.6030 2197913.8270 130.37 17+49.70 49.27 RT BY87 BY13-87 454390.8070 2198084.7160 151.83 27+01.78 85.03 RT SUNSET1 SUNSET 453869.2680 2198335.8310 166.02 32+64.42 50.66 RT BY56 (NOT SET) BL-56 453773.6130 2198405.1047 UNKNOWN 33+79.78 40.15 RT BY88 BY13-88 453397.4600 2198677.5160 165.26 38+35.75 56.24 RT BY89 BY13-89 452620.7520 2199423.7600 155.08 49+12.29 49.33 RT BY90 BY13-90 452162.7910 2199858.6330 149.75 55+43.83 49.15 RT BY91 BY13-91 451693.8640 2200306.3070 144.01 OUTSIDE PROJECT LIMITS BENCHMARKS **************************************** 717 ELEVATION = 137.10 N 443710 E 2168632 L STATION 1105+91.00 140 LEFT RR SPIKE SET AT THE BASE OF A 20"OAK **************************************** **************************************** 718 ELEVATION = 149.47 N 445008 E 2170189 L STATION 1126+63.00 370 LEFT RR SPIKE SET AT THE BASE OF A 15"GUM **************************************** **************************************** 719 ELEVATION = 162.27 N 445840 E 2171892 L STATION 1144+92.00 148 RIGHT RR SPIKE SET AT THE BASE OF A 18"PECAN **************************************** **************************************** BM100 ELEVATION = 166.36 N 447381 E 2172896 L STATION 1163+08.00 219 LEFT RR SPIKE SET AT THE BASE OF A 16" OAK **************************************** **************************************** BM101 ELEVATION = 161.52 N 449033 E 2174209 L STATION 1184+16.00 255 LEFT RR SPIKE SE AT THE BASE OF 24" PINE **************************************** **************************************** BM102 ELEVATION = 157.63 N 449184 E 2175440 L STATION 1195+33.00 330 RIGHT RR SPIKE SET AT THE BASE OF 12" PINE **************************************** **************************************** BM103 ELEVATION = 160.53 N 449768 E 2176921 L STATION 1211+25.00 347 RIGHT RR SPIKE SET AT THE BASE OF A 40" OAK **************************************** **************************************** BM104 ELEVATION = 138.08 N 450860 E 2178114 L STATION 1226+42.00 215 LEFT RR SPIKE SET AT HTE BASE OF A 14" OAK **************************************** **************************************** BM105 ELEVATION = 159.92 N 452043 E 2180349 L STATION 1247+88.00 827 LEFT RR SPIKE SET AT THE BASE OF A 20" PINE **************************************** **************************************** BM118 ELEVATION = 165.63 N 451946 E 2181004 L STATION 1255+45.00 830 LEFT NCGS BM " SA 18" DISK IS SET IN WEST HEADWALL OF CULVERT **************************************** **************************************** BM106 ELEVATION = 148.73 N 451152 E 2181996 Y43 STATION 16+70.00 244 LEFT RR SPIKE SET AT THE BASE OF A 10" OAK **************************************** **************************************** BM107 ELEVATION = 111.85 N 452287 E 2182914 L STATION 1278+96.00 301 LEFT RR SPIKE SET AT THE BASE OF A 15" OAK **************************************** **************************************** BM108 ELEVATION = 89.29 N 452881 E 2185179 L STATION 1302+39.00 303 RIGHT RR SPIKE SET AT THE BASE OF A 27" OAK **************************************** **************************************** BM119 ELEVATION = 95.21 N 453351 E 2186001 L STATION 1311+42.00 7 RIGHT NCGS BM "SA 17" DISK IS SET FLUSH WITH WINGWALL **************************************** **************************************** BM109 ELEVATION = 95.88 N 453719 E 2187291 L STATION 1324+51.00 180 LEFT RR SPIKE SET AT THE BASE OF A 20" PINE **************************************** **************************************** BM110 ELEVATION = 120.87 N 453572 E 2189003 L STATION 1341+17.00 245 LEFT RR SPIKE SET AT THE BASE OF A 24" MAPLE **************************************** **************************************** BM111 ELEVATION = 163.65 N 452389 E 2191014 L STATION 1363+73.00 333 RIGHT RR SPIKE SET AT THE BASE OF A 8" OAK **************************************** **************************************** BM112 ELEVATION = 162.24 N 452751 E 2192900 L STATION 1381+87.00 228 LEFT RR SPIKE SET AT THE BASE OF A 18" PINE **************************************** **************************************** BM113 ELEVATION = 161.18 N 452024 E 2193804 Y48 STATION 10+00.00 S 01^52'34.99" E Dist 498.63 RR SPIKE SET AT THE BASE OF A 30" OAK **************************************** **************************************** BM114 ELEVATION = 163.40 N 453064 E 2196554 L STATION 1420+02.00 190 LEFT RR SPIKE SET AT THE BASE OF A 18" PINE **************************************** **************************************** BM120 ELEVATION = 167.80 N 453743 E 2198410 L STATION 1439+62.00 67 RIGHT NCGS BM " SA 1" DISK IS SET IN SW WINGWALL OF SOUTHBOUND LANE BRIDGE **************************************** **************************************** BM117 ELEVATION = 119.54 N 454009 E 2199333 L STATION 1449+03.00 257 RIGHT RR SPIKE SET AT THE BASE OF A 20" OAK **************************************** **************************************** BM115 ELEVATION = 109.50 N 456012 E 2197606 Y52 STATION 10+21.00 207 RIGHT RR SPIKE SET AT THE BASE OF A 20" OAK **************************************** **************************************** BM116 ELEVATION = 148.81 N 451513 E 2200117 Y52 STATION 10+00.00 S 26^52'58.84" E Dist 5115.15 RR SPIKE SET AT THE BASE OF A 10" PINE ****************************************