BASELINE POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 2 B5145-2 972517.8850 1967403.7650 530.17 OUTSIDE PROJECT LIMITS 1 B5145-1 971727.5710 1968070.4930 495.43 OUTSIDE PROJECT LIMITS 100 BL-100 971542.1230 1968819.9280 453.12 OUTSIDE PROJECT LIMITS 101 BL-101 971454.9250 1969301.4890 420.12 12+45.53 15.47 RT 102 BL-102 971378.9310 1969705.3030 422.73 16+57.16 15.66 RT 3 B5145-3 971319.4120 1970064.2570 439.79 OUTSIDE PROJECT LIMITS 4 B5145-4 970864.2670 1971399.1220 435.17 OUTSIDE PROJECT LIMITS BENCHMARKS **************************************** TBM1 ELEVATION = 437.93 N 971314 E 1969994 L STATION 19+53.00 S 59°04'16.3" E Dist 0.43 PK NAIL IN C/L ROAD **************************************** **************************************** TBM2 ELEVATION = 437.69 N 971562 E 1969105 L STATION 10+33.00 55 LEFT NAIL IN 8" PINE **************************************** **************************************** TBM3 ELEVATION = 443.35 N 971358 E 1970101 L STATION 19+53.00 N 67°42'12.9" E Dist 116.27 NAIL IN 10" BIRCH ****************************************