BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 2 B4827-2 922189.2600 2207655.4760 395.54 OUTSIDE PROJECT LIMITS 1 B4827-1 923177.5200 2208507.3630 390.86 OUTSIDE PROJECT LIMITS 3 BL-3 923695.9671 2208758.7769 363.38 OUTSIDE PROJECT LIMITS 4 BL-4 924216.4319 2208870.6402 333.43 OUTSIDE PROJECT LIMITS 5 BL-5 924713.3937 2208951.4412 306.80 OUTSIDE PROJECT LIMITS 6 BL-6 925212.2538 2208993.0848 302.84 14+03.19 15.65 RT 7 BL-7 925813.8605 2209046.8367 326.65 OUTSIDE PROJECT LIMITS **************************************** BM1 ELEVATION = 304.60 N 924735 E 2208767 L STATION 10+00.00 S 65^33'42.73" W Dist 187.75 SURVEY BENCH TIE NAIL IN BASE OF 18" MAPLE **************************************** **************************************** BM2 ELEVATION = 294.78 N 925224 E 2209069 L STATION 11+50.00 S 23^57'17.44" W Dist 286.35 SURVEY BENCH TIE NAIL IN BASE OF 17" HICKORY **************************************** **************************************** BM3 ELEVATION = 328.60 N 925818 E 2209117 L STATION 11+50.00 N 10^50'11.36" E Dist 872.08 SURVEY BENCH TIE NAIL IN BASE OF 17" PINE ****************************************