-BL- ========================================================================= 1 (B4623-1) N 943157.0960 E 1713884.8890 ELEV 818.61 STA 5+00.00 Course from 1 to 2 S 80^45'49.41" E Dist 784.73 2 (B4623-2) N 943031.1420 E 1714659.4450 ELEV 811.56 STA 12+84.73 Course from 2 to 3 N 82^14'3.29" E Dist 408.76 3 (BL-3) N 943086.3750 E 1715064.4560 ELEV 792.29 STA 16+93.49 Course from 3 to 4 N 76^49'20.54" E Dist 675.49 4 (BL-4) N 943240.3660 E 1715722.1550 ELEV 747.89 STA 23+68.98 Course from 4 to 5 N 84^02'29.02" E Dist 689.07 5 (BL-5) N 943311.8980 E 1716407.4990 ELEV 716.40 STA 30+58.04 Course from 5 to 6 N 87^10'52.46" E Dist 674.44 6 (BL-6) N 943345.0650 E 1717081.1270 ELEV 732.73 STA 37+32.49 ========================================================================= BL PT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------------------------------------------------------------------- 1 B4623-1 943157.0960 1713884.8890 818.61 OUTSIDE PROJECT LIMITS 2 B4623-2 943031.1420 1714659.4450 811.56 OUTSIDE PROJECT LIMITS 3 BL-3 943086.3750 1715064.4560 792.29 OUTSIDE PROJECT LIMITS 4 BL-4 943240.3660 1715722.1550 747.89 OUTSIDE PROJECT LIMITS 5 BL-5 943311.8980 1716407.4990 716.40 15+53.94 17.60 LT 6 BL-6 943345.0650 1717081.1270 732.73 OUTSIDE PROJECT LIMITS BENCHMARKS: **************************************** BM1 ELEVATION = 711.84 N 943242 E 1716388 BL STATION 30+32.00 67 RIGHT BM #1 - RR SPIKE IN 24" POPLAR **************************************** **************************************** BM2 ELEVATION = 742.22 N 943198 E 1715868 BL STATION 25+10.00 57 RIGHT BM #2 - RR SPIKE IN 13" HICKORY ****************************************