Chain BL contains: 101 102 103 104 2 -BL- ========================================================================================= 101 (BL-101) N 572645.8090 E 2295717.0610 ELEV=114.78 STA 5+00.00 Course from 101 to 102 N 63^ 47' 30.2" E Dist 419.23 102 (BL-102) N 572830.9540 E 2296093.1880 ELEV=96.80 STA 9+19.23 Course from 102 to 103 N 48^ 43' 01.1" E Dist 459.48 103 (BL-103) N 573134.1060 E 2296438.4650 ELEV=80.27 STA 13+78.70 Course from 103 to 104 N 57^ 02' 44.5" E Dist 465.28 104 (BL-104) N 573387.2020 E 2296828.8800 ELEV=89.21 STA 18+43.98 Course from 104 to 2 N 70^ 35' 40.8" E Dist 645.52 2 (B4321-2) N 573601.6750 E 2297437.7280 ELEV=114.59 STA 24+89.50 ========================================================================================= BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 101 572645.8090 2295717.0610 114.78 OUTSIDE PROJECT LIMITS 102 572830.9540 2296093.1880 96.80 13+19.92 15.55 RT 103 573134.1060 2296438.4650 80.27 17+77.39 19.58 LT 104 573387.2020 2296828.8800 89.21 22+40.05 14.71 LT 2 573601.6750 2297437.7280 114.59 OUTSIDE PROJECT LIMITS ================================================================================================================== **************************************** TBM1 ELEVATION = 119.26 N 572734 E 2295795 L STATION 10+10 31 LEFT R/R SPIKE IN BASE OF 18" PINE **************************************** **************************************** TBM2 ELEVATION = 76.12 N 573132 E 2296509 L STATION 18+31 27 RIGHT R/R SPIKE IN BASE OF 20" SYCAMORE **************************************** **************************************** TBM3 ELEVATION = 118.09 N 573132 E 2297425 L STATION 26+54 S 27^ 28' 44.0" E Dist 453.56 R/R SPIKE IN BASE OF 15" GUM ****************************************