BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 1 B4255-1 714426.1892 1512424.7540 699.30 OUTSIDE PROJECT LIMITS 2 B4255-2 715782.0329 1512372.4570 685.69 10+96.61 15.65 LT 3 BL-3 716390.8590 1512539.7127 680.64 17+26.76 15.57 LT 20 (EQUALITY NOT SET) 716487.9301 1512583.2771 UNKNOWN 18+33.11 12.38 LT 4 BL-4 717389.5649 1512987.9205 715.30 OUTSIDE PROJECT LIMITS **************************************** BM 1 ELEVATION = 718.10 N 714011 E 1512415 L STATION 10+00 S 0^ 57' 09.6" E Dist 1674.01 R/R SPIKE SET IN BASE OF 48" OAKON HIGH SCHOOL PROPERTY IN FRONT OF TENNIS COURTS **************************************** **************************************** BM 2 ELEVATION = 689.62 N 716845 E 1512855 L STATION 22+67 102' RIGHT R/R SPIKE SET IN BASE OF 24" OAK ****************************************