BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 10 BL-10 368403.9720 2468878.8350 10.29 OUTSIDE PROJECT LIMITS 11 BL-11 368523.9300 2469286.2350 12.11 12+79.24 32.51 LT 12 NCGS "H 60" 368724.4330 2469921.3810 16.99 19+45.31 28.40 LT 2 NCGS HARN "NEW RIVER 2" 368961.9560 2470670.1700 16.17 27+30.87 29.95 LT 13 BL-13 369063.9580 2470966.5740 13.36 30+44.22 38.18 LT 14 BL-14 369203.2340 2471433.5580 15.48 35+29.63 40.17 LT 15 BL-15 369318.1230 2471890.6710 16.02 OUTSIDE PROJECT LIMITS BY POINT DESC. NORTH EAST ELEVATION Y STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 13 BL-13 369063.9580 2470966.5740 13.36 OUTSIDE PROJECT LIMITS 16 BY-16 368698.3560 2470811.7580 2.24 10+47.94 22.00 RT **************************************** BM1 ELEVATION = 9.67 N 368775 E 2469862 L STATION 19+04 95 LEFT SQ CUT IN CONC **************************************** **************************************** BM2 ELEVATION = 13.31 N 369191 E 2471041 L STATION 31+54 137 LEFT X CUT IN CONC SIDE WALK ****************************************