BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 4 BL-4 592359.7460 1437919.1520 706.51 OUTSIDE PROJECT LIMITS 3 BL-3 593132.2460 1437716.2160 692.46 15+99.70 12.76 LT 1 B4200-1 593378.1580 1437685.9140 698.04 18+43.34 21.68 LT 2 B4200-2 594341.8440 1437845.6340 717.07 OUTSIDE PROJECT LIMITS **************************************** BM1 ELEVATION = 707.20 N 592398 E 1437865 L STATION 10+00 S 3^ 21' 42.1" E Dist 151.65 RR SPIKE IN BASE OF 18 INCH PINE **************************************** **************************************** BM2 ELEVATION = 692.34 N 593144 E 1437742 L STATION 16+06 15 RIGHT RR SPIKE IN TOP OF A PIER SUPPORT OF THE BRIDGE **************************************** **************************************** BM3 ELEVATION = 703.69 N 593591 E 1437702 L STATION 20+56 29 LEFT RR SPIKE IN BASE OF FENCE POST ****************************************