BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 1 BL-1 744865.2103 1123468.7950 1332.31 11+46.23 14.54 LT 2 BL-2 745174.6990 1123780.0595 1296.68 15+80.68 17.67 LT 3 BL-3 745214.6945 1124178.3203 1262.94 19+77.58 15.23 LT 4 BL-4 745110.4810 1124575.5538 1237.91 23+92.27 13.84 LT 5 BL-5 744784.4980 1124943.3200 1230.44 28+90.56 15.12 LT 6 BL-6 744413.4807 1125085.4220 1220.05 32+84.35 15.66 RT 7 BL-7 744049.9513 1125341.2335 1218.54 OUTSIDE PROJECT LIMITS **************************************** BM1 ELEVATION = 1268.32 N 745109 E 1124248 L STATION 20+83 53 RIGHT NAIL IN BASE OF 18" WHITE OAK **************************************** **************************************** BM2 ELEVATION = 1242.23 N 745069 E 1124536 L STATION 23+64 37 RIGHT NAIL IN BASE OF 12" POPLAR **************************************** **************************************** BM3 ELEVATION = 1227.86 N 744832 E 1124840 L STATION 27+93 46 RIGHT NAIL IN BASE OF TRIPLE POPLAR ON CREEK BANK ****************************************