BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 4 BL-4 709614.4349 1116555.5924 1257.65 10+15.83 136.63 RT 6 BL-6 709847.6162 1116676.7079 1263.77 13+21.40 20.57 LT 7 BL-7 709873.8248 1116986.7580 1290.14 OUTSIDE PROJECT LIMITS 8 BL-8 710146.0064 1117209.2211 1303.27 OUTSIDE PROJECT LIMITS BY POINT DESC. NORTH EAST ELEVATION Y STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 3 BY-3 709780.0090 1116062.7089 1260.35 10+27.75 27.19 LT Y4 BL-4 709614.4349 1116555.5924 1257.65 15+42.95 20.78 LT 5 BY-5 709210.4702 1116854.8546 1272.36 OUTSIDE PROJECT LIMITS BY1 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 9 BY1-9 710132.5989 1116789.7909 1296.06 14+86.05 285.73 LT Y7 BL-7 709873.8248 1116986.7580 1290.14 OUTSIDE PROJECT LIMITS **************************************** **************************************** BM1 ELEVATION = 1275.01 N 709563 E 1116515 L STATION 10+00 S 41^ 37' 49.2" E Dist 132.50 NAIL IN BASE OF 18" WHITE OAK **************************************** **************************************** BM2 ELEVATION = 1291.66 N 709870 E 1117034 L STATION 15+53 N 87^ 47' 57.7" E Dist 126.94 CHISLED SQUARE IN BASE OF R/R SIGNAL POLE #2210 ****************************************