BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 3 BL-3 788363.1300 1681714.1560 807.59 10+11.01 15.92 LT 1 B3834-1 788826.7360 1681692.5980 780.87 14+68.99 39.38 LT 9 (EQUALITY NOT SET) 789034.1689 1681791.4445 UNKNOWN 16+91.33 8.69 RT 2 B3834-2 789772.9550 1682143.4930 810.16 OUTSIDE PROJECT LIMITS TL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 4 TL-4 788901.7820 1681512.0360 763.02 15+09.41 229.77 LT 5 TL-5 788967.2710 1681713.8620 762.60 16+06.36 46.67 LT 10 (EQULITY NOT SET) 789034.1689 1681791.4445 UNKNOWN 16+91.33 8.69 RT 6 TL-6 789051.4960 1681811.5390 771.87 17+14.53 22.06 RT 7 TL-7 789152.3620 1681932.5690 776.98 18+61.21 94.68 RT 8 TL-8 789366.2200 1682066.6210 779.06 21+20.40 105.87 RT **************************************** BM-1 ELEVATION = 766.39 N 788871 E 1681560 L STATION 14+90 178 LEFT R/R SPIKE SET IN BASE OF 12" OAK 169' OFF W. EP AND 88' FROM POWER POLE BEHIND MTL BUSINESS **************************************** **************************************** BM-2 ELEVATION = 783.10 N 789507 E 1681652 L STATION 20+33 323 LEFT R/R SPIKE SET IN EP OF MAGNOLIA LN. 33' NORTH OF 48" CON. PIPE, JUST PAST 2ND HOUSE ON LEFT. ****************************************