BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 1 BL-1 670380.2840 855787.3280 2606.72 OUTSIDE PROJECT LIMITS 2 BL-2 670303.9740 856094.7070 2597.45 OUTSIDE PROJECT LIMITS 3 BL-3 670252.7430 856312.3670 2590.84 OUTSIDE PROJECT LIMITS 4 BL-4 670377.7180 856531.2280 2584.61 11+05.67 29.08 LT 5 BL-5 670431.8910 856884.7000 2586.05 14+58.59 33.49 RT 6 BL-6 670571.2590 857316.6010 2587.07 19+12.34 35.87 RT 7 BL-7 670781.3390 857753.5720 2585.10 23+93.18 26.34 LT 8 BL-8 670877.0410 858040.4110 2591.04 26+95.56 27.11 LT BY3 POINT DESC. NORTH EAST ELEVATION Y3 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 105 BL-5 670431.8910 856884.7000 2586.05 10+33.26 21.01 LT 111 BY2-11 670074.6660 856949.7460 2584.85 OUTSIDE PROJECT LIMITS BY4 POINT DESC. NORTH EAST ELEVATION Y4 STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 106 BL-6 670571.2590 857316.6010 2587.07 10+36.85 4.85 RT 112 BY2-12 670205.1120 857407.9640 2589.01 OUTSIDE PROJECT LIMITS **************************************** BM2 ELEVATION = 2586.67 N 670459 E 856785 L STATION 13+73 24 LEFT CHISLED "X" ON TOP OF CONCRETE WALL **************************************** **************************************** BM3 ELEVATION = 2585.68 N 670705 E 857513 L STATION 21+41 30 LEFT 8 INCH SPIKE IN ROOT OF 18 INCH MAPLE TREE **************************************** **************************************** BM6 ELEVATION = 2590.09 N 670223 E 857303 Y4 STATION 12+51 S 12^ 11' 14.0" W Dist 138.92 CHISLED SQUARE ON NORTHEAST BRIDGE WINGWALL ****************************************