Chain BL contains: 1 2 3 4 5 -BL- ========================================================================================= 1 (B-3613 BL-1) N 344551.6180 E 2188655.1370 ELEV 46.96 STA 5+00.00 Course from 1 to 2 N 57^ 04' 16.5" E Dist 614.32 2 (B-3613 BL-2) N 344885.5580 E 2189170.7620 ELEV 46.19 STA 11+14.32 Course from 2 to 3 N 57^ 16' 09.9" E Dist 385.45 3 (B-3613 BL-3) N 345093.9680 E 2189495.0130 ELEV 49.08 STA 14+99.77 Course from 3 to 4 N 56^ 14' 08.8" E Dist 509.22 4 (B-3613 BL-4) N 345376.9820 E 2189918.3460 ELEV 47.99 STA 20+08.99 Course from 4 to 5 N 62^ 49' 09.6" E Dist 477.41 5 (B-3613 BL-5) N 345595.0630 E 2190343.0380 ELEV 47.49 STA 24+86.40 ========================================================================================= BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 1 B-3613 BL-1 344551.6180 2188655.1370 46.96 OUTSIDE PROJECT LIMITS 2 B-3613 BL-2 344885.5580 2189170.7620 46.19 15+92.97 16.78 LT 3 B-3613 BL-3 345093.9680 2189495.0130 49.08 19+78.42 14.88 LT 4 B-3613 BL-4 345376.9820 2189918.3460 47.99 24+87.35 21.74 LT 5 B-3613 BL-5 345595.0630 2190343.0380 47.49 29+61.99 18.11 LT **************************************** BM80 ELEVATION = 43.95 N 344783 E 2188918 L STATION 13+26 69 LEFT R/R SPIKE IN BASE OF 20 INCH GUM **************************************** **************************************** BM81 ELEVATION = 45.59 N 345770 E 2190716 L STATION 33+66 64 LEFT P-K NAIL IN CORNER OF CONC. SLAB ****************************************