BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 3 760268.4837 1628488.8484 796.91 OUTSIDE PROJECT LIMITS 1 760804.9660 1628523.3410 788.31 8+28.89 4.76 LT 4 761415.7978 1628499.4195 786.98 14+40.18 8.70 LT 2 762013.9240 1628431.8280 784.66 20+43.38 25.93 LT 5 762533.8835 1628475.7350 799.93 OUTSIDE PROJECT LIMITS BY POINT DESC. NORTH EAST ELEVATION Y STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 7 761074.4645 1626925.9881 755.51 OUTSIDE PROJECT LIMITS 8 761316.7296 1627911.5384 765.96 19+49.16 53.83 LT 4 761415.7978 1628499.4195 786.98 25+36.07 98.52 LT 9 761254.4939 1629224.6783 777.41 32+62.04 46.25 RT 10 761117.4671 1630056.2340 787.03 OUTSIDE PROJECT LIMITS **************************************** BM1 ELEVATION = 753.48 N 761273 E 1627487 Y STATION 15+29.00 87 LEFT R/R SPIKE SET IN ROOT OF FORKED WILLOW OAK BETWEEN 7TH ST. AND US 29/70 S. BOUND **************************************** **************************************** BM2 ELEVATION = 781.59 N 761288 E 1630112 Y STATION 40+43.00 N 46^02'38.06" E Dist 155.86 R/R SPIKE SET IN ROOT OF 36"3 FORKED OAK ON N. SIDE OF PIEDMONT DR. (SR 1890) SOUTH OF STATE EMPLOYEE'S CREDIT UNION **************************************** **************************************** BM3 ELEVATION = 796.91 N 760268 E 1628489 L STATION 7+00.00 S 06^03'20.10" W Dist 410.59 BL-3 **************************************** **************************************** BM4 ELEVATION = 799.93 N 762534 E 1628476 L STATION 7+00.00 N 01^44'10.83" W Dist 1858.55 BL-5 **************************************** **************************************** BM5 ELEVATION = 755.51 N 761075 E 1626926 Y STATION 40+43.00 S 88^02'49.28" W Dist 3075.58 BY-7 ****************************************