Copyright (2000) GEOPAK Corporation =========== All rights reserved G E O P A K Project: 34472.1.3 Tip No: R-2582 L&S No: 01-10-078 County: NORTHAMPTON Subject: US 158 from I-95/NC 46 in Roanoke Rapids to SR 1312 (ST. John Church Road) Date: MARCH-AUGUST 2011 Mapping Units: US Feet LOCATION & SURVEYS UNIT-WILLIAMSTON FIELD OFFICE LOCATING ENGINEER: CASEY WHITLEY (252-792-7283) ============================================================================== PROJECT DATUM DESCRIPTION: LOCALIZED PROJECT COORDINATES ARE BASED ON THE NAD83 (CORS96) STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR "CENTROID" N: 9793000.000(US FT) E: 2474400.000(US FT) - USING AN AVERAGE COMBINED GRID FACTOR (LOCALIZED TO GRID) OF 1.000084770. ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES, UNITS ARE "US SURVEY FOOT". VERTICAL DATUM IS NAVD88. ============================================================================== BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BL10 BL10 993142.7479 2407855.6703 131.91 13+85.23 33.37 LT R258202 R258202 992479.3400 2408287.4490 147.16 21+74.96 20.00 RT BL11 BL11 992000.8860 2408712.2272 141.34 28+15.78 19.42 LT BL12 BL12 990895.5698 2409483.4937 125.80 41+61.39 60.51 RT BL13 BL13 990144.3469 2410050.7170 127.79 51+01.05 63.12 RT BL14 BL14 989597.2237 2410710.7185 127.51 59+41.86 50.47 RT BL15 BL15 989417.6072 2411423.0785 126.74 66+70.40 18.08 LT BL16 BL16 989205.0318 2412323.1468 115.26 75+95.02 1.18 LT BL17 BL17 988880.4106 2413139.7545 77.25 84+70.91 53.88 LT BLA18 BLA18 988330.3709 2414050.1039 102.04 95+33.85 15.95 LT R258203 R258203 988057.0790 2414622.1250 115.24 101+66.48 55.34 LT R258204 R258204 987442.6450 2415565.3860 144.56 112+81.06 79.65 LT BL18 BL18 986756.1818 2416270.4703 131.15 122+62.28 17.49 LT BL19 BL19 986052.2294 2417151.8856 118.66 132+90.82 278.15 RT BL20 BL20 985931.7876 2417956.2971 113.62 139+85.42 456.64 RT BL21 BL21 986201.7857 2418862.4778 120.80 150+35.64 111.29 RT BL22 BL22 985580.2779 2419719.7526 134.94 161+49.77 7.26 RT BL23 BL23 984822.3549 2419966.2377 151.89 169+52.46 4.01 RT BL24 BL24 983962.8912 2420159.3333 149.62 178+33.30 1.74 RT BL25 BL25 983164.5574 2420459.9423 123.49 186+87.23 6.41 RT BL26 BL26 982897.1346 2420604.6334 104.87 189+91.18 3.56 RT BL27 BL27 982658.4501 2420743.2538 117.88 192+67.01 6.58 LT R258205 R258205 982175.7950 2421111.7990 100.24 198+66.27 104.95 LT BL28 BL28 981535.9180 2421394.9511 96.62 205+67.31 48.90 LT BL29 BL29 981437.5485 2421749.5517 106.03 208+91.44 273.47 LT BL30 BL30 981052.4537 2422571.3571 107.32 220+16.76 320.25 LT BL31 BL31 980889.9461 2423358.6645 107.20 228+88.93 59.68 LT BL32 BL32 981229.9683 2424146.3838 105.86 237+51.09 7.76 LT BL33 BL33 981607.2391 2424897.7592 108.84 245+91.77 5.09 RT BL34 BL34 981839.7326 2425346.1797 84.57 250+96.88 6.25 RT BL35 BL35 982145.2469 2425941.4535 111.15 257+65.96 10.55 RT BL36 BL36 982461.6676 2426764.6598 115.11 266+53.97 1.05 LT BL37 BL37 982545.3403 2427821.3228 107.52 276+61.07 191.05 LT BL38 BL38 981761.4693 2428679.5133 82.71 287+70.40 18.56 LT BL39 BL39 981141.8977 2429332.4795 99.81 296+70.51 12.23 LT R258207 R258207 980647.9970 2429854.5580 100.98 303+89.18 8.25 LT R258208 R258208 980029.9270 2430516.4290 100.97 312+94.76 9.10 LT BL41 BL41 979105.5204 2431487.7365 100.60 326+35.60 2.33 RT BL42 BL42 978363.4066 2432286.9881 101.24 337+26.25 1.80 LT BL43 BL43 977525.7341 2433231.4426 109.86 349+90.47 2.26 LT BL44 BL44 977000.1776 2434219.1893 104.06 361+09.17 24.10 LT BL45 BL45 976535.5906 2435023.7091 103.74 370+36.59 41.61 LT BL46 BL46 975912.8437 2435921.7675 99.76 381+27.61 27.07 LT BL47 BL47 975310.6306 2436752.7230 96.51 391+51.89 46.32 LT R258209 R258209 974594.9460 2437555.0170 94.97 402+25.03 13.97 LT BL48 BL48 973883.9682 2438346.1213 92.83 412+88.55 15.35 LT BL49 BL49 973154.0532 2439154.7635 89.26 423+77.90 15.25 LT BL50 BL50 972499.8907 2439961.9641 90.62 434+20.67 51.41 LT BL51 BL51 972057.2575 2440589.5040 96.89 441+93.39 8.19 LT BL52 BL52 971740.3698 2441411.4707 88.24 450+77.53 17.48 LT BL53 BL53 971471.6411 2442340.6146 80.52 460+30.54 84.54 LT BL54 BL54 970769.3801 2443182.2682 93.04 471+13.67 31.28 LT BL55 BL55 970055.6982 2444049.7495 94.23 482+36.94 19.44 LT BL56 BL56 969409.6985 2444849.8641 96.99 492+65.29 18.08 LT BL57 BL57 968876.8120 2445512.3055 98.31 501+15.46 18.47 LT BL58 BL58 968309.7029 2446220.2128 98.76 510+22.51 20.72 LT R258211 R258211 967653.3880 2447160.6280 98.68 521+66.61 99.31 LT R258212 R258212 966990.6800 2448193.2740 97.55 533+41.36 278.46 LT BL59 BL59 965904.9737 2448589.6541 97.02 544+20.39 64.23 LT BL1 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BL1106 BL1106 982700.0384 2426747.7219 118.01 266+71.11 239.33 LT EQBL37 982545.3403 2427821.3228 107.54 276+61.07 191.05 LT BL2 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- EQ258209 974594.9460 2437555.0170 95.00 402+25.03 13.97 LT R258210 R258210 973471.8370 2437491.1940 95.50 409+29.98 863.39 RT BY POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- EQR258202 992479.3400 2408287.4490 147.15 21+74.96 20.00 RT R258201 R258201 991377.2620 2408241.2840 132.53 29+67.28 749.97 RT BY1 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- EQABL12 990895.5698 2409483.4937 125.76 41+61.39 60.51 RT BY1100 BY1100 990820.7169 2409045.2288 129.33 39+56.62 455.16 RT BY1101 BY1101 990380.8548 2408732.2468 129.73 41+18.53 970.16 RT BY2 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY2102 BY2102 990937.4631 2409784.3971 127.41 43+09.55 204.72 LT EQBL12 990895.5698 2409483.4937 125.76 41+61.39 60.51 RT BY7 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY7103 BY7103 982824.6065 2421010.9526 120.16 192+46.22 320.96 LT EQBL27 982658.4501 2420743.2538 117.81 192+67.01 6.58 LT BY9 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY9104 BY9104 982656.7672 2422062.0110 108.12 198+88.48 1169.72 LT EQR258205 982175.7950 2421111.7990 100.24 198+66.27 104.95 LT R258206 R258206 981695.0950 2420078.9890 101.71 198+04.98 1032.60 RT BY11 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- EQR258206 981695.0950 2420078.9890 101.71 198+04.98 1032.60 RT BY11105 BY11105 981671.2271 2420412.3230 97.95 199+82.76 749.62 RT BY13 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY13107 BY13107 983098.4769 2427303.1624 106.23 271+39.52 624.63 LT EQABL37 982545.3403 2427821.3228 107.54 276+61.07 191.05 LT BY14 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY14108 BY14108 981018.5080 2430967.6640 96.64 309+48.87 1039.28 LT EQR258207 980647.9970 2429854.5580 100.99 303+89.18 8.25 LT BY15 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY15109 BY15109 979896.7132 2431454.4495 98.41 320+70.75 552.68 LT EQBL41 979105.5204 2431487.7365 100.61 326+35.60 2.33 RT BY16 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- EQABL41 979105.5204 2431487.7365 100.61 326+35.60 2.33 RT BY16110 BY16110 978770.6909 2431404.8562 100.94 328+03.83 303.46 RT BY17 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- EQBL43 977525.7341 2433231.4426 109.84 349+90.47 2.26 LT BY17111 BY17111 977548.3773 2432588.6081 108.18 345+03.19 387.30 RT BY18 POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- BY18112 BY18112 972490.8761 2441068.8877 83.39 444+57.76 606.00 LT EQBL51 972057.2575 2440589.5040 96.83 441+93.39 8.19 LT **************************************** BM1 ELEVATION = 128.73 N 991703 E 2408799 L STATION 30+99.00 115 RIGHT R/R SPIKE IN 22" OAK **************************************** **************************************** BM2 ELEVATION = 87.35 N 989026 E 2412995 L STATION 82+74.00 111 LEFT R/R SPIKE IN 24" PINE **************************************** **************************************** BM3 ELEVATION = 154.85 N 984662 E 2419604 L STATION 170+32.00 392 RIGHT R/R SPIKE IN POWER POLE **************************************** **************************************** BM4 ELEVATION = 102.47 N 982428 E 2421369 L STATION 197+65.00 450 LEFT R/R SPIKE IN 24" SWEET GUM **************************************** **************************************** BM5 ELEVATION = 107.76 N 981353 E 2425409 L STATION 249+28.00 467 RIGHT R/R SPIKE IN 14" PINE **************************************** **************************************** BM6 ELEVATION = 79.42 N 981867 E 2428712 L STATION 287+22.00 117 LEFT S 65^04'48.69" E Dist 22571.88 R/R SPIKE IN 36" HICKORY **************************************** **************************************** BM7 ELEVATION = 102.44 N 978867 E 2431344 L STATION 326+94.00 275 RIGHT R/R SPIKE IN 20" GUM **************************************** **************************************** BM8 ELEVATION = 100.33 N 975783 E 2435918 L STATION 382+00.00 81 RIGHT R/R SPIKE IN 10" OAK **************************************** **************************************** BM9 ELEVATION = 75.72 N 971368 E 2442330 L STATION 460+71.00 11 RIGHT R/R SPIKE IN 30" OAK **************************************** **************************************** BM10 ELEVATION = 99.43 N 968992 E 2445652 L STATION 501+52.00 196 LEFT R/R SPIKE IN 20" PINE ****************************************