Chain BL contains: 1 2 3 4 5 6 -BL- ========================================================================================= 1 (B5347-1) N 830830.7330 E 1853021.4640 ELEV 597.40 STA 5+00.00 Course from 1 to 2 N 42^02'0.45" E Dist 705.24 2 (B5347-2) N 831354.5510 E 1853493.6660 ELEV 596.00 STA 12+05.24 Course from 2 to 3 N 37^02'44.44" E Dist 606.46 3 (BL-3) N 831838.6020 E 1853859.0300 ELEV 582.97 STA 18+11.70 Course from 3 to 4 N 58^11'20.14" E Dist 651.50 4 (BL-4) N 832182.0190 E 1854412.6660 ELEV 535.81 STA 24+63.20 Course from 4 to 5 N 84^17'31.57" E Dist 681.10 5 (BL-5) N 832249.7590 E 1855090.3880 ELEV 507.07 STA 31+44.30 Course from 5 to 6 S 89^04'8.48" E Dist 451.69 6 (BL-6) N 832242.4200 E 1855542.0170 ELEV 511.38 STA 35+95.98 ========================================================================================= BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 1 B5347-1 830830.7330 1853021.4640 597.40 OUTSIDE PROJECT LIMITS 2 B5347-2 831354.5510 1853493.6660 596.00 OUTSIDE PROJECT LIMITS 3 BL-3 831838.6020 1853859.0300 582.97 OUTSIDE PROJECT LIMITS 4 BL-4 832182.0190 1854412.6660 535.81 OUTSIDE PROJECT LIMITS 5 BL-5 832249.7590 1855090.3880 507.07 13+79.85 14.99 LT 6 BL-6 832242.4200 1855542.0170 511.38 OUTSIDE PROJECT LIMITS **************************************** BM1 ELEVATION = 515.66 N 832098 E 1855126 BL STATION 31+82.00 151 RIGHT RR SPIKE IN BASE OF 27" RED OAK **************************************** **************************************** BM2 ELEVATION = 523.67 N 832183 E 1855559 BL STATION 5+00.00 N 61^56'47.76" E Dist 2875.36 RR SPIKE IN BASE OF 18" PINE ****************************************