Chain BL contains: 1 2 3 4 5 6 -BL- ========================================================================================= 1 (B4624-1) N 980516.3500 E 1827614.7960 ELEV 672.84 STA 5+00.00 Course from 1 to 2 S 86^29'36.58" E Dist 975.59 2 (B4624-2) N 980456.6810 E 1828588.5610 ELEV 625.90 STA 14+75.59 Course from 2 to 3 S 54^25'14.18" E Dist 844.23 3 (BL-3) N 979965.4825 E 1829275.1814 ELEV 586.52 STA 23+19.82 Course from 3 to 4 S 89^42'47.65" E Dist 407.84 4 (BL-4) N 979963.4413 E 1829683.0126 ELEV 562.11 STA 27+27.66 Course from 4 to 5 N 49^22'58.44" E Dist 729.83 5 (BL--5) N 980438.5635 E 1830237.0125 ELEV 564.56 STA 34+57.49 Course from 5 to 6 N 51^19'49.40" E Dist 454.53 6 (BL-6) N 980722.5695 E 1830591.8955 ELEV 568.94 STA 39+12.03 ========================================================================================= BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 1 B4624-1 980516.3500 1827614.7960 672.84 OUTSIDE PROJECT LIMITS 2 B4624-2 980456.6810 1828588.5610 625.90 OUTSIDE PROJECT LIMITS 3 BL-3 979965.4825 1829275.1814 586.52 11+87.56 15.20 RT 4 BL-4 979963.4413 1829683.0126 562.11 15+92.43 17.23 RT 5 BL--5 980438.5635 1830237.0125 564.56 23+21.07 13.69 LT 6 BL-6 980722.5695 1830591.8955 568.94 27+73.36 15.87 LT BENCHMARKS: **************************************** BM1 ELEVATION = 558.50 N 980515 E 1830217 L STATION 23+57.00 85 LEFT R/R SPIKE IN BASE OF 27" GUM **************************************** **************************************** BM2 ELEVATION = 566.57 N 980623 E 1830575 L STATION 27+06.00 61 RIGHT R/R SPIKE IN BASE OF 18" POPLAR ****************************************