BL POINT DESC. NORTH EAST ELEVATION L STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 5 BL-5 643415.6669 1671659.9575 552.64 OUTSIDE PROJECT LIMITS 4 BL-4 643195.3641 1672043.2426 532.41 13+31.39 17.30 RT 1 B4103-1 643109.3280 1672389.7560 514.93 16+86.45 25.40 LT 3 BL-3 642956.1593 1672779.2873 521.08 21+02.47 13.43 LT 2 B4103-2 642638.7251 1673398.2646 560.69 OUTSIDE PROJECT LIMITS BY POINT DESC. NORTH EAST ELEVATION EY STATION OFFSET ------------ ---------------- ---------------- ---------------- ---------------- ---------------- ---------------- 13 BL-3 642956.1593 1672779.2873 521.08 OUTSIDE PROJECT LIMITS 6 BY1-6 642666.8788 1673046.3911 531.30 OUTSIDE PROJECT LIMITS **************************************** BM 1 ELEVATION = 559.24 N 643451 E 1671683 L STATION 10+00 N 40^ 00' 19.1" W Dist 115.36 R/R SPIKE SET IN BASE OF 24" OAK, 48' NORTH OF EDGE OF BADEN LAKE RD. **************************************** **************************************** BM 2 ELEVATION = 544.83 N 642667 E 1673046 L STATION 24+54 S 18^ 11' 40.9" W Dist 118.52 R/R SPIKE SET IN BASE OF 24" OAK, 34' NORTH OF EDGE OF LAKESHORE DR. ****************************************